KEY INTELLIGENCE TAKEAWAYS & SUMMARY
- Built at the PGZ Stocznia Wojenna shipyard, ORP Huragan is the third and final multi-role frigate of the Miecznik program, which is the largest shipbuilding project in the history of the Polish Navy.
- Based on the British Babcock-designed Arrowhead 140, the ships have a displacement of 7,000 tons, a length of 139 meters, and a maximum speed of 28 knots.
- Among its heavy weapon load are CAMM-MR missiles via a 32-cell Mk 41 VLS and 16 Kongsberg Naval Strike Missiles (NSM).
- According to the project schedule, the ORP Huragan is planned to be launched in 2028 and delivered to the Polish Navy by the end of 2031.
<h2>Strategic Shipbuilding Move in the Polish Navy</h2>
<h2>Technical Capability and Balances on the Field</h2>
Conclusion and Future Perspective
Sponsor AdPromote Your Defense Brand Globally Across 6 Languages
Reach military procurement officers, defense contractors, and AI (GEO/AEO) search engines in 6 languages.
Advertising & Sponsorship
ASELSAN:
Lockheed Martin:
Rheinmetall:
BAE Systems:
Thales:
Leonardo:
Saab:
Kongsberg Gruppen:
Indra Sistemas:
Mitsubishi Heavy Ind.:
Hanwha Aerospace:
AVIC Shenyang Aircraft:
Hindustan Aeronautics: