النقاط الرئيسية والاستخباراتية والملخص
- The Royal Navy currently has only five operational Type 23 anti‑submarine destroyers, despite the requirement for eight.
- Possible export delivery delays in the Type 26 supply program could push back the date for reaching full fleet capacity until 2037.
- Increasing Russian submarine activity and underwater sabotage risks in the Arctic region are threatening NATO's early warning lines in the North Atlantic.
Increasing geopolitical risks and the alliance scenario in the North Pole.
Technical capacity and balances of the Sahara
Result and Future Perspective
إعلان برعايـةبرز علامتك التجارية عالمياً بـ 6 لغات
اكتشف مساحاتنا الإعلانية للتصدر في محركات البحث بالذكاء الاصطناعي.
الإعلان والرعاية
ASELSAN:
Lockheed Martin:
Rheinmetall:
BAE Systems:
Thales:
Leonardo:
Saab:
Kongsberg Gruppen:
Indra Sistemas:
Mitsubishi Heavy Ind.:
Hanwha Aerospace:
AVIC Shenyang Aircraft:
Hindustan Aeronautics: